Flow Foundation Partner with us

Invest · Project 01

Build a School: one brick at a time

A safe, permanent early learning centre for a community that needs one, delivered turn-key.

Stage
Ready to replicate
Investment
From R300,000 per centre

2018 build cost for Sunbeam, to be re-costed for current prices

Partner on this project

Concept render of a Flow ECD centre with mural

The investment case

The opportunity at a glance

Where companies invest

Building materials, construction milestones, finishes and classroom equipment, or finishing Sunbeam itself.

Partner value

A visible community asset, with dated evidence for each construction milestone and a direct line between funding and delivery.

Community return

A permanent learning space in place of informal structures, and a safer place for educators to teach.

Where it stands

  1. Concept
  2. Design & approval
  3. First centre built
  4. Replicate

Sunbeam is the first centre; the next site is still to be identified

  • <R300kto build Sunbeam’s double-storey centreFlow’s 2022 Build a School campaign
  • 27construction milestones, from setting out to the muralFlow milestone plan, 2022
  • R130kto finish Sunbeam (R130,050)Costed snag list, Oct 2022
  • R20a symbolic brick in the campaignFlow’s 2022 campaign

The need

Why this matters

Many young children in South Africa don’t have access to the nutrition, health, education and social protection they need to reach their potential. Too many ECD centres operate from informal structures with no path to registration or support.

What we’ve done: Sunbeam ECD in Westlake moved from two informal structures and an outhouse into a double-storey blockwork centre, built for just under R300,000 and handed to its founding teachers. It now prepares 30 children for Grade R.

Children who attend early learning programmes still arrive at school unevenly prepared, and the gap follows household income.

  • 43%of children in early learning programmes are on track to “thrive by five”.Thrive by Five Index 2021, p.13
  • 38% vs 58%on track in the poorest and the richest income groups.Thrive by Five Index 2021, pp.15–16
  • 8 of 20children starting Grade R begin with the right foundations.Thrive by Five Index 2021, pp.5, 13

The project

What we’ll deliver

  1. 01Site identification with the community and municipality
  2. 02Design, council submission and approvals
  3. 03Construction in permanent blockwork, with loft accommodation where needed
  4. 04Fit-out, play areas, shade and a signature mural
  5. 05Handover to local owners with training and support

How it works

Step by step

  1. 01

    Agree the terms

    The owner applies for council consent to run an ECD centre; operators commit to registration training and a maintenance reserve.

  2. 02

    Choose the build

    Prefab, container and blockwork options are compared. Sunbeam chose blockwork for permanence.

  3. 03

    Design and approve

    An architect draws the plans to the building regulations and they go through council approval.

  4. 04

    Build in 27 steps

    From trenches and foundations to walls, roof, services and finishes, each step photographed and dated.

  5. 05

    Finish and furnish

    Playground, landscaping, shade and the artist’s mural turn a building into a place children want to be.

  6. 06

    Support the centre

    Food support, maintenance, educator training and a twice-yearly review keep the centre working.

Sunbeam’s main structure went up between October 2019 and January 2020. The centre is operating, but the finishing work costed in October 2022 is still outstanding.

Imagery

See the work

Every image is labelled: real photo, 3D model, concept render or stock image.

Roadmap

From commitment to impact

  1. 01

    Fund

    Raise the build budget, brick by brick

  2. 02

    Approve

    Site, plans and council approval

  3. 03

    Build

    Foundations to roof to fit-out

  4. 04

    Hand over

    Owner training and ongoing support

Investment

Where funding goes

Amounts are from Flow’s records and dated; a new site is re-costed before any commitment.

FundWhat it pays forAmount
A brickThe campaign unit anyone can give: one of about 15,000 symbolic bricks that make up a centre’s budget.R202022 campaign
Finish SunbeamThe outstanding items from Flow’s costed list of 21, including fire-retardant paint, sliding doors, a roof over the stoep, shade, a covered walkway, gutters, side gates and landscaping. Still required.R130,050Oct 2022
A construction milestoneSponsor a stage of a new build, such as foundations, the roof or the classroom fit-out, with photos when it is done.Scoped with you
A whole centreA turn-key double-storey centre like Sunbeam, from approvals to handover.<R300,000Sunbeam, recorded 2022; re-costed per site

Evidence and reporting

What partners see

You receive

  • Project budget
  • Milestone updates
  • Site visit
  • Partner report
  • Dated progress photosEvery milestone photographed, from cleared site to finished classroom.
  • Milestone trackerPercentage complete per construction step, shared with partners.
  • Approvals on recordCouncil decisions and inspections kept with the project file.
  • Spend evidenceCosted line items against invoices, and site visits on request.

Partner roles

How each partner makes it happen

Companies

Fund bricks, a classroom or the whole centre; donate materials, plumbing, electrical or landscaping; send teams for build days.

Government

Align the centre with ECD registration so it can access subsidies and support from day one.

Municipalities

Allocate or help secure sites, fast-track plan approvals and connect services.

Transparency: Real photographs, 3D models, concept renders and stock images are labelled as such. Figures are dated and sourced; where Flow has no costed figure, the line says “Scoped with you”. Kulcha Kolektiv, the EduPod and the driver pathway are proposals: sites, specifications, partners and terms remain subject to agreement, and no partner is named until agreed. Hello Brand, owned by Flow’s chairperson, would provide the content player in EduPods and the vehicles in the driver pathway; this is declared to partners up front.